THIS IS PODWORLDINPICS4    

                IF INTERESTED IN EXPLANATIONS, ASK US. IF NOT, WHAT CAN WE SAY! AFTER ALL,              
MOONMAN TOOK THE PICS, WROTE THE PROCEDURES, AND TRAINED THE PEOPLE
 AS A DESIGN, PROCESS, MANUFACTURING, QUALITY, RELIABILITY, AND LEAN MFG. ENGINEER
AT OVER 100 COMPANIES IN THE PAST 25 YEARS.

THIS PART OF THE POD SITE IS DESIGNED FOR INTERACTION. THOSE WISHING TO
CONTRIBUTE ANYTHING OF VALUE, AS PICS OR TEXT, PLEASE DO SO AND CREDIT
WILL BE GIVEN. ALL THE FOLLOWING PHOTO DOCUMENTS ARE AVAILABLE
ON THE POD FTP SITE AND ARE FREE.


     WE ALL NEED IMPROVEMENT IN OUR WORK AND LIVES. WORKING CONCURRENTLY, WE CAN DO IT BETTER.     

PODWORLDINPICS4 CONTENTS:

CLICK ON LINKS

CORRELATE TDR FINDINGS WITH X-SECTIONS
MASTER DRAWING NOTES
MLB MATERIALS
LEAN MANUFACTURING
SOME FAILURE ANALYSIS - COMPONENTS & TOOLS


CORRELATE TDR FINDINGS
WITH X-SECTIONS AND
MATERIAL SELECTIONS


All master drawing requirements clearly
indicated as notes, images, tables, and
constructions - with exact material call outs.


MLB onstruction - with exact material call outs.


MLB construction verified -
with exact material call outs.


TDR tesging to verify impedance
requirements.


MLB constructions - with exact material call outs
corelated with x-section and TDR results in
one conclusive report. It doesn't get better
than this as there is no argument about
design intent and designer requirements.
THIS IS PROOF OF DESIGN
THIS LITTLE EXERCISE
HAS VERIFIED MLB
CONSTRUCTIONS FOR
MLB MATERIALS,
TDR RESULTS,
AND REQUIRED REPORT
WITH EVERYTHING
CORRELATED BACK TO
DESIGN REQUIREMENTS
FOR CPI.


MASTER DRAWING
NOTES
MLB MATERIALS
LEAN MANUFACTURING
EXCERPTED FROM POD LEAN MANUFACTURING CONSULTATION
PROCEDURES
FAILURE ANALYSIS - COMPONENTS & TOOLS


EBIC IMAGE


SCANNING ELECTRON MISCROSCOPE


EDX

ON TO YOURWORLDINPICS